INSTALLATIONS GUIDELINES
FOR Model # starts from
"Wooden Wall Panels - HPI-RWP-xx"
-
HybridPanels.com lightweight constructions makes it simple to handle and install. No special skill set is required.
-
It’s the Number One choice for DIY Projects & Contractors.
-
Compared to conventional Stone or Bricks, HybridPanels.com saves you time and money without compromising quality & appearance
Installation on any Base Board Type
- Blue Board
- Particle Board
- Plaster Board
- Ply Board
- Villa Board
- Brace Board
STEP 1
Draw 2 lines as picture, these lines will become exactly position to install your wooden panel.
STEP 2
Trace a level line vertically from the left and right side of your wall, the area between these two corresponds to the vertical adjustment area.
STEP 3
Cut a minimum from side of your first panel as picture:
STEP 4
Apply glue as picture:
STEP 5
Position the first panel at the lower left section of the wall. Detail as picture: the panel
STEP 6
Nail the panel on the contour lips of the panel and the two bottom rows of the panel
Please note: ONLY NAIL ON PLYWOOD, NOT WOOD PIECES
STEP 7
Apply a small amount of glue on the female veneer edge of the panel already glued in place.
STEP 8
Repeat step 4 then Insert the second panel in the previous one, using the horizontal adjustment section. Repeat step 6 and 7.
STEP 9
Repeat step 4 then Insert the second panel in the previous one, using the horizontal adjustment section. Repeat step 6 and 7
STEP 10
For the last panel to be installed in a row, draw an horizontal line and one vertical line from the ceiling.
STEP 11
Cut the panels of the last row to fit within the horizontal adjustment section
STEP 12
Insert the molding in the reserved space set at the beginning of the installation of the wooden wall panel.